Study on Securing the Steam Supply for a Refinery Site
Leuna Refinery Power Plant, Germany
Problem Statement:
- The study was based on a previous analysis of various implementation options for electricity and steam supply
- Preferred options were developed in greater detail and evaluated from both technical and economic perspectives
- Analysis of a new facility with seven boiler systems
- The conversion of existing facilities to natural gas was examined
- The primary objective is to reduce CO2 emissions
Project facts
| Boiler systems | • 4 Water-tube boiler • 3 Large-water-tube boiler |
| Steam rails | • HD-Steam: 39 bar / 370 °C / max. 120 t/h • MD-Steam: 18 bar / 260 °C / max. 80 t/h • ND-Steam: 6 bar / 180 °C / max. 60 t/h |
| Fuel of the future | Erdgas |
| Customer | Iqony GmbH / Total Refinery Central Germany |
| IQS Service Period | 06/2020 – 12/2020 |