Planning a waste-to-energy plant Kamionka
Waste-to-energy plant, Kamionka, Poland
SFW Energia planned to build a waste-to-energy plant in Kamionka. In addition to generating approximately 10 MW of electricity, the plant was intended primarily to produce heat for the existing district heating system in Kamionka. In addition to municipal solid waste, waste-derived fuel was also to be considered as a potential fuel source.
Iqony Solutions (IQS) provided the following services:
- Conceptual Design
- Layout Planning
- Preparation of the scope of work for various components
- Evaluation of bids
Project facts
| Installed capacity | Ca. 37,5 MWth |
| Live steam parameters | 41,5 bar / 423 °C |
| Fuel | Municipal solid waste, fuel from waste |
| Fuel consumption | Ca. 11,25 t/h |
| Customer | SFW Energia Gliwice |
| IQS-Service Period | 07/2019 – 12/2019 |