Planning a waste-to-energy plant Kamionka

Waste-to-energy plant, Kamionka, Poland

SFW Energia planned to build a waste-to-energy plant in Kamionka. In addition to generating approximately 10 MW of electricity, the plant was intended primarily to produce heat for the existing district heating system in Kamionka. In addition to municipal solid waste, waste-derived fuel was also to be considered as a potential fuel source.

Iqony Solutions (IQS) provided the following services:

  • Conceptual Design
  • Layout Planning
  • Preparation of the scope of work for various components
  • Evaluation of bids

Project facts

Installed capacityCa. 37,5 MWth
Live steam parameters41,5 bar / 423 °C
FuelMunicipal solid waste, fuel from waste
Fuel consumptionCa. 11,25 t/h
CustomerSFW Energia Gliwice
IQS-Service Period07/2019 – 12/2019