Owner's Engineer at a Sewage Sludge Incineration Plant
Sewage Sludge Incineration Plant in Bottrop, Germany
The Emschergenossenschaft operates a sewage sludge incineration plant at its Bottrop site, which is being equipped with a new steam turbine and undergoing upgrades to its boiler and flue gas cleaning systems.
Iqony Solutions (IQS) provided the following services as owner’s engineer for a phased project (6 lots) involving existing facilities, planning, and construction management during ongoing operations:
- Concept study, plant design, preliminary design, cost estimate
- Layout planning, 3D model
- Permit planning and management
- Procurement planning and procurement
- Supervision of detailed engineering
- Construction supervision, site management, commissioning management
Project facts
| Incineration capacity | 2 x 10 MWth |
| System throughput | 8,25 t/h treated sewage sludge |
| Emissions limits | In accordance with the 17th Federal Immission Control Ordinance |
| Generator | 3,2 MWel |
| Customer | Emschergenossenschaft |
| IQS-service period | 2015 – 2020 |