IWSPP Power Plant RAWEC, Rabigh, Kingdom of Saudi Arabia

The Petro-Rabigh Complex is a refinery in Rabigh, Saudi Arabia, that continuously receives electricity, water, and steam from the Rabigh IWSPP power plant.

Iqony Solutions (IQS) was commissioned by RPC, the operator of the Rabigh power plant, to provide operational management support. In doing so, IQS stabilized the operation of the power plant’s first phase and supported the expansion of the power plant to include Phase II.

In addition, IQS provided further technical services, including acting as the owner’s engineer during the construction of the REA and the reverse osmosis plant.

In 2016, IQS delivered a comprehensive training center with a simulator for training power plant employees.

Project facts

Installed capacity
  • Capacity 360 + 160 MW
  • Steam 1,230 + 1,015 t/h (3 pressure stages)
  • Water 5,580 + 2,270 t/h
Technology

9 + 4 boilers, each with a capacity of 470 t/h

3 + 2 wet limestone flue gas desulfurization systems

5 + 3 steam turbines, each with a capacity of 120 MW

16 + 8 reverse osmosis plants

FuelHeavy fuel oil
CustomerRabigh Arabian Water & Electricity Company (RAWEC)
IQS-Service Period2005 – 2008; 2013 – ongoing