Iqony as the general contractor at the refinery site
BP STEAM at the Gelsenkirchen-Scholven refinery site, Germany
Ruhr Oel GmbH (ROG) planned four new high-pressure steam boilers with a total maximum thermal output of 436 MWth, with two units to be located in the North construction zone and two in the Central construction zone.
ROG commissioned Iqony as the EPC contractor for the design, construction, commissioning, and subsequent maintenance.
Iqony Solutions (IQS) was responsible for the technical execution and delivery of the following services:
- General Planning
- Detailed Design
- Technical Supervision of Subcontractors
- Construction Site Management/Construction Supervision
- Commissioning Management
Project facts
| Installed capacity | 2 x 140 t/h (2 x 122 MWth) 2 x 120 t/h (2 x 96 MWth/15 MWel) |
| Technology | Natural circulation boiler |
| Fuel | Natural gas/coke oven gas/refinery gas |
| Customer | Iqony GmbH/Ruhr Oel GmbH |
| IQS-Service Period | 2017 – on an ongoing basis |