Feasibility Study on the Modernization of a Combined Heat and Power Plant

DESIGNETZ – Renovation of the Fenne Power Plant, Völklingen, Germany

As part of a feasibility study, all possible options for modernizing the Fenne CHP plant were examined.

These include, among other things, converting to natural gas or biomass, retrofitting a gas turbine, and constructing a new combined cycle power plant:

  • Assessment of technical feasibility and development of the concept
  • Thermal engineering calculations
  • Determination of CAPEX/OPEX
  • Scheduling
  • Operational management concept
  • Concept clarification through preliminary inquiries and supplier discussions regarding electrolysis and compressors
  • Approval feasibility
  • Funding
  • Flue gas treatment (FGT) assessment based on the new SOx limit value of 200 mg/Nm³ (dry basis) as a daily average
  • Development of retrofit concepts to optimize flue gas treatment systems

Project facts

Installed capacity471 MWel / 400 MWth
Technology DT/GTSiemens HMN/V82.1
FuelBallast coal, mine gas/natural gas
CustomerSTEAG Power GmbH
IQS-Service Period04/2019 – on an ongoing basis