Berliner Energie und Wärme AG (BEW) operates a coal-fired power plant at the Reuter West site, which supplies district heating to parts of Berlin. In the future, electricity and heat will be generated by the following plants:
- State-of-the-art CHP plant with 300 MWel and 500 MWth
- Power-to-heat plant with over 100 MWth
- Large wastewater heat pumps with over 100 MWth
- Steam turbine for utilizing waste heat from a waste-to-energy plant, 100 MW
Overall planning of all measures at the site:
- Design and approval planning
- Procurement planning through to contract award
- Planning support during implementation
- Translated with DeepL.com (free version)
Project facts
| Installed capacity | 300 MWel / 600 MWth |
| Fresh steam parameters | 110 bar / 530 °C |
| fuels | Natural gas, hydrogen, biomass |
| CO2-savings | > 2.000.000 t/a |
| customer | Berlin Energy and Heat Corporation (BEW) |
| IQS-performance period | 06/2022 – 12/2029 |